Sector: Utilities
Category: Wastewater Treatment
Client: Anglian Water
Project Name: Hitchin STW
Completion Date: June 2011
The project comprised the removal and disposal of existing traversing bridges and sludge scraper systems and replacement with two PST traversing bridges and sludge/scum removal systems.
EPS designed, manufactured, supplied, installed and commissioned the new system to two existing primary settlement tanks.
EPS provided for full mechanical, electrical, instrumentation, automation and control works as well as site management and supervision.