Linlithgow STW

Sector: Utilities

Category: Wastewater Treatment

Client: Scottish Water

Project Name: Linlithgow STW

Completion Date: 2011

 

EPS provided for the design, manufacture, supply, test, inspection, delivery to site, offloading, positioning and complete site installation, including all necessary site testing and commissioning of one picket fence thickener.

The works included a complete MEICA turnkey package by EPS.

 

             1 picket fence thickener2.JPG              1 picket fence thickener1.JPG

 

Search

Search - Use spaces to separate your keywords
Image
© 2013 EPS Water Ltd (UK)
  • 2 Whitehouse Way, South West Industrial Estate, Peterlee, Co Durham, SR8 2RA
  • Tel: +44 (0) 8702 640004, Fax: +44 (0) 8702 640005, Email: info@epswater.co.uk

linkedinyoutube

  • Sustainable Water Solutions