Seven Villages

Sector:  Utilities

Category:  Wastewater Treatment

Client:  North Tipperary County Council

Project Name:  Seven Villages North and South Tipperary Grouped WW DBO Schemes

Completion Date:  June 2008

Project Value:  £7.2m

 

This project by the EPS Group involved the design, build, operate (DBO) of seven wastewater treatment plants for North Tipperary County Council. Works included full turnkey mechanical, electrical, instrumentation, control, automation and civil works. 

Treatment processes included pre-treatment, screening, activated sludge treatment, biological nutrient removal, chemical treatment for P removal, nutrient reduction and sludge treatment. All works were successfully transferred to a 20 year operate contract following successful commissioning and handover.

Unique features of contract

Among the unique features were:

  • Installation of two vacuum sewer systems, which was a first for Ireland
  • Installation of a Steds system as a pilot trial for the collection and treatment of wastewater in a rural, unsewered environment. The Steds project included the removal of 30 septic tank and soakaway systems and the replacement with Orenco Sted’s technology with individual solids separation and storage at each household, but with one centralised package textile treatment system and one controlled discharge

 

 

 

Search

Search - Use spaces to separate your keywords
C O R K  F I N A L  Thumbnail1
© 2013 EPS Water Ltd (UK)
  • 2 Whitehouse Way, South West Industrial Estate, Peterlee, Co Durham, SR8 2RA
  • Tel: +44 (0) 8702 640004, Fax: +44 (0) 8702 640005, Email: info@epswater.co.uk

linkedinyoutube

  • Sustainable Water Solutions