Sector: Utilities
Category: Wastewater Treatment
Client: Thames Water
Project Name: Weston STW
Completion Date: 2011
This project by EPS involves the design, build, supply and installation of two flight and chain scraper systems and removal and disposal of the existing systems.
The unique and innovative design provided for a quick turnaround time for replacement of existing non-functional scraper systems.
EPS provided for the full turnkey package including all mechanical, electrical, control and automation works at the site.
