Sector: Commercial
Category: Wastewater
Client: Cornerstone Construction
Project Name: Ballyfin Demesne Wastewater Treatment Plant, Co Laois
Completion Date: March 2008
The EPS Group was responsible for the design and build of a 250 PE MBR wastewater treatment plant at Ballyfin Demesne, consisting of inlet works and biological treatment, c/w P removal and UV treatment.
The project included mechanical and electrical design, installation and commissioning.
- Treatment plant throughput: 45m³/day
- Degree of treatment: 5:5:5:1 mg/l BOD:SS:ammonia: Total P
- Treatment process: membrane technology
- Sludge treatment process: n/a
- UV treatment on outlet